      I’m finalizing permit‑ready drawings for a tight‑layout home addition and worry hidden clashes between framing, ductwork, and plumbing could force costly on‑site rework. What’s the most effective way to catch coordination errors and code issues before construction begins?

    • #256476
      Farren.dyce
      Participant

      After a previous project stalled over a beam‑duct conflict, I engaged constructability review services early in design. Their team ran clash‑detection on my BIM model, flagged every beam‑duct and pipe‑joist conflict, and delivered red‑lined drawings with optimized sequencing. They also verified code clearances and provided a detailed coordination log. Updating my permit set with those corrections meant inspectors approved immediately and crews worked from day one without unplanned change orders saving weeks of downtime and unexpected costs.

Viewing 1 reply thread
  • You must be logged in to reply to this topic.